In 2014 we collaborated with Riko to install four cranes into the high-bay warehouse of a creamery in Brest. The cranes are 24,7 m high and have a load capacity of 1000 kg. In 2021-2022 we elongated the corridors and added one more crane in each of them, so each corridor now has two operational cranes. We added a special lower crane to serve the area where final palettes are commissioned.
Customer: Creamery Savuškin, Brest, Belarus
Partner: RIKO d.o.o.
Field of work: Logistic systems
Year: 2014, 2021 expansion with 4 more cranes and a special crane for goods commissioning
Scope:
4 + 4 storage-retrieval machines 24,7 m high pallets:
- design,
- manufacturing,
- overseeing the assembly,
- Software for PLC
- commissioning