Hydromechanical equipment

Hydroelectric power plant Lešće, Croatia, 2011
Photo gallery
ProjectProjectProjectProjectProjectProject

Design, assembly, erection, and automation of hydromechanical equipment in hydroelectric power plant Lešće.


Hydroelectric power plant Lešće exploits the hydroelectric potential of river Dobra. It covers daily peaks in electrical consumption in Croatia. The plant is composed of three Francis water turbines with total power of 42.3 MW.

We have designed, manufactured, constructed and commissioned the following hydromechanical equipment: intake trash racks, penstocks, draft tube gates, gates with lifting mechanism, service and control gates within the housing and with hydraulic drive. We have also designed and delivered a bridge crane, intended for installation of turbines.


Contact us

We will be glad to offer you the best solution meeting your requirements.
info@iskraimpuls.si